T: 01661 821 744 E: mhclimited@aol.com


Dalton-in-Furness By-Pass

Dalton-in-Furness By-Pass Here we constructed a long 'Tubosider' culvert beneath the new By-pass and adjusted the existing road layout to accommodate the new by-pass, including the kerb, block paving to the roundabouts and splitter islands and tarmac to the new footpaths